loading

Huatao Group-Vibrating Screen Technology Solution and Service for Quarry & Mining Industry Since 2008.

How do I install polyurethane dewatering screen panels correctly on my existing screening machine?

2026-09-22

Answer
Correct installation protects panel life and keeps dewatering performance stable. ๐Ÿ”ง

Direct Answer
Confirm the fixing system first—pin, bolt, wedge or rail. Clean the support frame, check flatness, install panels in the correct flow direction, and tighten to the manufacturer's torque. Never force a panel into place.

Technical Parameters
• Fixing types: pin, bolt, wedge, rail, tension
• Panel tolerance: usually ±1–2 mm
• Support frame flatness: within 1–2 mm
• Torque: follow machine maker's spec
• Gap between panels: keep uniform

Selection Advice
For OEM machines, order panels matched to the original fixing system. For aftermarket, send drawings or photos of the deck and fixing points. Custom mounting systems are available.

Practical Tips

  1. Inspect and clean the frame before installation.

  2. Replace worn support bars and pins.

  3. Install from one side and work across.

  4. Check panel seating after the first hour of operation.

  5. Keep spare pins and wedges on site.

Data / Case
A plant reduced premature panel failure by 50% after correcting frame flatness and using the correct pin torque.

๐Ÿ“ง Email: annie.lu@huataogroup.com
๐Ÿ“ฑ Mobile: +86 18032422676 (WhatsApp/WeChat)
๐ŸŒ Visit: www.tufflexscreen.com

prev
What polyurethane hardness and material grade should I select for highly abrasive mining dewatering applications?
Why do my polyurethane dewatering screen panels blind or peg, and how can I fix it?
next
Related questions
GET IN TOUCH WITH Us
Product Lives
Customer service