Huatao Group-Vibrating Screen Technology Solution and Service for Quarry & Mining Industry Since 2008.
Ceramic Pulley Lagging for Conveyor Drive Pulleys
Product Information
Ceramic Pulley Lagging can be supplied with different installation methods to meet project and maintenance requirements. Cold-bond or direct-bond systems are bonded to the prepared steel pulley shell and are convenient for field maintenance. Hot-vulcanized ceramic lagging can provide a strong, factory-applied bond. For selected pulley designs, weld-on or mechanically retained replaceable systems can simplify replacement and reduce maintenance downtime. The appropriate installation method depends on pulley design, operating conditions and maintenance requirements.
1. Effective material containment – Keeps bulk material on the receiving belt and reduces side spillage.
2. Dust and fines control – Closes the gap between skirtboard and belt to help contain fugitive dust.
3. Wear-resistant options – Natural rubber, SBR and polyurethane can be selected for different operating conditions.
4. Easy maintenance – Clamp or external mounting arrangements simplify inspection, adjustment and replacement.
5. Customized conveyor fit – Skirtboard length, seal profile, thickness and mounting can match the conveyor layout.
6. Reduced cleanup – Better containment helps reduce material accumulation around the conveyor.
Modern skirtboard systems are commonly designed around the transfer point as a complete containment system, with proper belt support and sealing geometry being important to reduce dust and spillage.
Technical Specifications
|
fAQ