A spiral chute is the quietest machine in a mineral processing plant: no motor, no reagents, no moving parts — just a helical trough and the physics of a flowing film. This guide walks through what it is, how the separation actually happens, where it fits in a flowsheet, and the operating disciplines that decide whether it recovers values or reproduces shortcuts in the tailings.
A spiral chute is a stationary gravity separation device: an inclined helical trough, five to seven turns tall, down which dilute slurry flows as a thin film. Heavy, round grains in the 0.1–2 mm band sink through the film, reach the slow layer at the trough wall, and migrate to the inside of the helix; light grains ride the fast outer stream. Splitters at the discharge cut concentrate, middlings and tailings. The machine uses no power and no reagents, and its performance depends almost entirely on feed preparation, flow stability and splitter discipline.
|
Parameter |
Typical Range |
Why It Matters |
|
Feed size |
0.1–2 mm (best 0.15–1 mm) |
Values outside the band never stratify properly |
|
Desliming cut |
Minus ~50 µm removed |
Slimes ride the film and dirty middlings |
|
Feed density |
20–40% solids |
Thin films starve; thick films short-circuit |
|
Capacity per start |
1–3 t/h |
Stability beats peak capacity |
|
Products |
Concentrate, middlings, tailings |
Splitters are the grade-recovery dial |
|
Power at machine |
Zero |
Operating cost is one pump and one water line |
A spiral chute is a semicircular trough wound into a vertical helix of five to seven turns, two to four metres tall, standing on a light steel frame. Modern columns are built from glass-reinforced plastic, often polyurethane-faced in abrasive duty, and most banks use double-start or triple-start units so that two or three independent streams share one column. "Spiral chute" and "spiral concentrator" are two names for the same machine; what separates one quotation from another is pitch, trough diameter, start count, liner material and the test work behind the recommendation. The device belongs to the gravity separation equipment family beside shaking tables and centrifugal concentrators — the high-tonnage, low-cost end of the range, as shown on the spiral chutes product page.
The separation mechanism has two parts running at once, and every operating decision follows from them.
The downstream film. A feed box spreads slurry into a thin, even film across the trough width. Gravity accelerates it down the helix, and curvature makes the outside of the bend run faster than the inside — the same differential that sweeps a river around the outside of its bend. Light, flaky and coarse particles ride this fast outer stream and never settle.
The secondary circulation. The same curvature rolls the film across the trough: the surface layer flows outward while the bottom layer drifts inward. This is the engine of the separation. Heavy, spherical particles drop through the film within the first turns, enter the slow near-wall layer, and are carried inward toward the helix's inside edge. Wash water dosed along the inner radius keeps the collected heavy strand fluid; without it the strand packs and begins shedding values.
The split. By the bottom turn, three zones span the trough width — a slow heavy strand inside, a fast light stream outside, a middling band between them. Adjustable splitters convert the zones into product launders. The splitters are not trim; they are the actual grade-recovery dial, and the correct position moves with feed grade.
Two consequences matter. Particle shape competes with density: a flat light flake hugs the wall and impersonates a heavy mineral, which is why scrubbing precedes spirals in clay-bound circuits. And because the top turns do the sorting, liner wear there is the first place recovery leaks.
Reading the film. Two minutes at a running spiral tell an experienced operator more than a shift of sampling. An even, glassy film with a clean dark strand inside means the feed is right. A dry patch means the distributor is starving that column. A fuzzy, clouded film means slimes arrived that desliming should have caught. A strand that breaks and reforms means the feed rate is hunting. All four symptoms are upstream problems wearing a spiral's clothes, and all four are cheaper to fix at the feed box than at the concentrate launder.
One column, one helix: feed at the top, three products at the bottom, nothing between but geometry.
|
Material |
Where Used |
Strengths |
Watch-outs |
|
GRP (glass-reinforced plastic) |
Full trough |
Smooth, light, low cost |
Gelcoat wears first at top turns |
|
Polyurethane facing |
Full trough / hot spots |
Longest wear life, stable surface |
Higher unit cost |
|
Cast basalt / ceramic |
First two turns only |
Extreme abrasion resistance |
Retrofit complexity |
|
Steel frame |
Structure |
Rigid, cheap |
Corrodes in wet coastal climates |
Polyurethane facing pays for itself in abrasive or high-tonnage duty; plain GRP suits small, gentle circuits. Replacement strategy matters more than material choice: the top turns of a whole row should be replaced together, because mixing old and new surfaces in one bank splits its performance. Matched trough sections, feed boxes and splitters are supplied in the gravity separation spares range.
|
Device |
Capacity |
Power |
Natural Role |
|
Spiral chute |
1–3 t/h per start |
None |
Roughing, scavenging |
|
Shaking table |
0.5–2 t/h |
Yes |
Final cleaning |
|
Centrifugal concentrator |
2–10 t/h |
Yes |
Fine gold, upgrading |
|
Jig |
10+ t/h |
Yes |
Coarse pre-concentration |
Flowsheets that let each device do its natural job get the most from all of them: spirals rough, shaking tables finish, and centrifugal concentrators catch what film flow misses.
|
Industry |
Duty |
Spiral Passes |
|
Tin mining |
Cassiterite roughing, tailings retreatment |
Rougher + scavenger + cleaner |
|
Mineral sands |
Heavy mineral preconcentration |
Long rougher rows |
|
Chromite |
Beach and metallurgical ore |
Roughing after scrubbing |
|
Gold (alluvial) |
Feed preparation and roughing |
Roughing ahead of tables |
|
Iron ore |
Fine hematite roughing |
Rougher + cleaner |
|
Recycling and slag |
Metal and garnet recovery |
Scavenging rows |
A 100 t/h roughing duty at 2.5 t/h per start means 40 starts — twenty double-start columns — plus cleaning capacity sized from the rougher concentrate mass.
A small-site installation: two starts, one frame, gravity feed from a header tank.
Send: head assay and target mineral with its specific gravity; feed size distribution after planned desliming; slurry density and hourly feed rate; available head and a plant layout sketch; water quality and climate constraints.
Ask: which similar feed the supplier has actually run and at what recovery; how the recommended split position is verified during commissioning; what liner wear allowance applies at the first two turns for this duty; what spares set ships with the bank; whether trough sections can be replaced column by column without re-levelling the row. A quotation built without test work is a guess with a price — the machine is cheap, the downtime from a wrong recommendation is not.
Liner wear at the top turns. A roughened surface sheds the heavy strand early and bleeds recovery for months before anyone notices. Inspect monthly with a torch and a feeler; replace trough sections as a set.
Splitter drift. Operators rotate, feed grade steps, splitters stay where they were. Grade loss at constant recovery is a splitting decision, not a machine fault. Record feed grade and splitter position together, and re-cut when grade steps change.
Feed surge. A spiral has no reserve. Pump cycling, an uneven distribution box or a surging tank turns a good separation into noise. Fix the feed, not the spirals — and listen: starts that sound different from their neighbours are describing distribution problems, not their own health.
Behind all three sits slimes. Minus-50-micron material stays suspended in the film, never reaches the wall layer, and exits as dirty middlings that contaminate everything downstream. When recovery disappoints, audit desliming first.
Everything is reachable, nothing is buried, and no item needs a shutdown longer than a coffee break. That is the maintenance argument for a machine with no moving parts: the few parts that do wear — liners, splitters, feed boxes — are all bolted items at the ends of the column, and a two-person crew can service an entire bank in a planned half-shift.
Minsur's November 2026 filing for San Rafael, its tin operation in Puno, Peru, describes retreating about 651,000 tonnes of B3 tailings plus roughly 540,000 tonnes of usable material from the Larancota waste dump, for about US$22 million, with preconcentrate returning to the existing plant. The arithmetic works because the duty fits the machine: cassiterite is heavy, the tailings are already sand-sized, history has done the desliming, and gravity roughing at near-zero operating cost turns historical waste into feed. The same template applies wherever old tailings still hold values between 0.1 and 2 mm with a workable density ratio — audit the tailings inventory before buying new ore, because the cheapest tonnage a plant will ever process is the tonnage it already owns.
Vendors use both names for the same helical trough device. Compare pitch, diameter, start count, liner material and test work, not the label on the drawing.
Reliably down to roughly 50 microns. Below that, efficiency falls steadily; below 20 microns the device is effectively a washing machine. Fine fractions belong on tables, centrifugal concentrators or flotation.
Feed tonnage ÷ t/h per start, times the number of passes the flowsheet requires, plus cleaning capacity sized from the rougher concentrate mass. Example: a 100 t/h plant at 2.5 t/h per start needs 40 roughing starts — twenty double-start columns — plus a cleaner bank at roughly a fifth to a quarter of roughing capacity, run at lower density and tighter splits. Specify one spare column per bank where downtime matters; trough replacement then becomes a planned event rather than an emergency.
None at the machine. The plant pays for feed pumping, wash water and elevation head.
The splitters are fixed while the feed is not. A strand set for yesterday's grade now cuts water into the concentrate. Re-cut on grade steps and record positions against feed assays. Plants that keep a splitter log — feed assay, position, resulting grade — turn this from a mystery into a lookup table, and new operators inherit the settings instead of reinventing them. The notebook costs nothing and outperforms any instrument on a device this simple.
Not directly. Scrub first, deslime second, spiral third — clay rides the film and contaminates every product the machine makes.
A spiral chute converts a density difference into three product streams using gravity, film flow and water. Nothing moves, nothing runs except one pump, and nothing about the result is automatic: prepare the feed, hold the flow steady, cut the products deliberately, and a row of spirals outworks far more expensive separation equipment. Skip any of the three and the machine faithfully reproduces your shortcuts in the tailings launder. On a device with no moving parts, the moving part is the decision — so write it down, and start from the spiral chute | spiral concentrator specification page when you compare quotations.
Contact: Annie Lu